«ASX and Media Release 17 March 2015 THUNDERBIRD MINERAL SANDS PROJECT UPDATE KEY POINTS Metallurgical Improved recoveries of all products using full ...»

-- [ Page 1 ] --

ASX and Media Release

17 March 2015

THUNDERBIRD MINERAL SANDS PROJECT UPDATE

KEY POINTS

Metallurgical

Improved recoveries of all products using full scale process equipment

Overall recovery of zircon increased by 5% (to 67%)

Primary zircon constitutes 80% of recovered zircon

Testwork indicates likely feasibility of co-disposal of polymer treated slimes and sand

tails which will greatly assist water recovery and recycling Geotechnical  Investigations confirm deposit amenable to mining by conventional equipment Groundwater High volume, very low salinity aquifer confirmed adjacent to Thunderbird deposit  Application to

Abstract

water for processing submitted to Department of Water  Sheffield Resources Limited (“Sheffield” “the Company”) (ASX:SFX) is pleased to provide a PreFeasibility Study progress update on its 100% owned, world-class Thunderbird Mineral Sands Project, located near Derby in northwest Western Australia (Figure 9).

The update comprises results of metallurgical testwork and process engineering, slimes codisposal testwork, geotechnical and groundwater investigations.

Significantly, the metallurgical testwork, using full scale process equipment, has achieved higher recoveries of all products compared to those obtained from earlier Scoping Study testwork.

Tailings co-disposal testwork indicates polymer treated tails achieve high consolidation rates and high water recovery from tailings is expected. This is likely to result in a reduced operational footprint requirement for tailings disposal and faster environmental rehabilitation.

Sheffield’s Managing Director Bruce McQuitty said: “These are very pleasing results, confirming the Thunderbird mineralisation can be treated using full scale equipment with improvements to mineral recoveries an added bonus.

“The 5% increase in zircon recovery and the high percentage (80%) of primary zircon is particularly significant because zircon is the main revenue driver for the project.

“Our metallurgical consultants have excelled in this round of testwork and we expect further process optimisation will continue to achieve incremental improvements in recoveries.

“The tailings co-disposal results are also very favourable, indicating the likely feasibility of codisposal of slimes and sand tails which will increase the recovery of water to be re-used in processing.

“The results of geotechnical investigations confirm the amenability of the deposit to mining whilst hydrogeological studies have shown that suitable groundwater for processing occurs adjacent to the deposit. The lodgement of a 5C Application for Water is yet another important step in the development of the Thunderbird Project.” Sheffield Resources Ltd ACN 125 811 083 L1, 57 Havelock Street West Perth WA 6005 T: +61(0) 8 6424 8440 F: +61(0) 8 9321 1710 Metallurgical Testwork and Process Engineering Leading mineral sands specialists, Robbins Metallurgical, undertook metallurgical process development testwork on a 12.5t bulk sample on full-scale and scalable equipment. The testwork included experimental process variations to maintain or improve recoveries and final product grades. This testwork follows earlier process flowsheet testwork on 6t and 5t samples during the Scoping Study.

The 12.5t sample was collected from composited aircore drill hole samples from closely spaced holes drilled in the up-dip portion of the deposit during 2013.

The head grade of the sample is 9.3% HM, with 4.2% oversize (+5.0mm), 6.0% oversize (+1.0mm) and 20% slimes (-38micron). These grades are similar to those of the high grade (+7.5% HM) component of the Thunderbird resource (11.8% HM, 10% oversize (+1mm) and 15% slimes – refer to ASX release dated 12 December 2014).

The sample was processed through a feed preparation trommel/scrubber and desliming circuit, a spiral separation process, and a concentrate upgrade stage using wet high intensity magnetic separators (WHIMS) and spiral separators to produce magnetic and non-magnetic concentrates. The slimes behaved well, with low flocculant dosages producing high settling rates.

Figure 1: Material loading (easy to work with) Figure 2: Material feeding (no hang up)

–  –  –

Tailings Co-Disposal Testwork In conjunction with Robbins Metallurgical, tailings co-disposal testwork was undertaken by Golder Associates and BASF using Thunderbird sand tails, slimes and site groundwater.

The program comprised laboratory testing to assess the influence of Rheomax® polymer treatment on the initial dewatering and consolidation behaviour of co-disposed tailings. This test work indicated that polymer treatment resulted in an increased rate of water release and dry density development.

The magnitude of the beneficial effect of polymer treatment was comparable to other mineral sands materials that BASF and Golder Associates have investigated. The increased rate of water release is likely to result in a reduced operational footprint requirement for tailings disposal, increased recovery of water from the tailings, and will facilitate faster rehabilitation.

Figure 6: Thickened slimes after 5-10 minutes settling Hydrogeological Assessment A ‘H3’ Hydrogeological Assessment has been prepared by consultants Pennington Scott to support the Company’s 5C application to the Department of Water to abstract water from the aquifer underlying the Thunderbird deposit.





Investigations that have been undertaken in support of the 'H3' assessment include:

drilling and testing of three test production bores to obtain information on aquifer  parameters;

installation of 57 monitoring bores to monitor groundwater levels;

 airborne electromagnetic surveying to characterise the geometry of the aquifer;

 numerical modelling to predict the regional drawdowns from water abstraction; and  flora and fauna surveys to characterise the ecology of the proposed minesite and  surrounding area.

A conceptual borefield design has been developed with approximately 12 bores equipped to pump between 20 and 40 L/sec to provide water for the project. Testing indicates the water is of good quality, with 200 mg/L of TDS (Total Dissolved Solids).

Sheffield’s 5C Application to take water has been submitted to the Department of Water.

Figure 7: Groundwater pump testing at Thunderbird

Geotechnical Studies A geotechnical investigation was undertaken by geotechnical consultants ATC Williams during

2014. The primary aim of the program was to investigate the extent, strength and defect geometry of indurated layers encountered in aircore drilling and to obtain required geotechnical parameters for slope stability analyses.

A program of sonic core drilling comprising 20 holes for 781 metres was completed between 15 July and 5 October 2014. The holes were sited as twins to previously completed aircore drill holes and were selected to investigate a range of combined thickness, induration type and hardness encountered in the aircore program. The fieldwork and logging was carried out by experienced ATC Williams Engineers who logged and sampled the test holes. The sonic drilling was undertaken by Groundwave Drilling Services with a Boart Longyear DB320 Sonic Drill Rig.

Geotechnical logging of the sonic core indicated that the predominant material encountered was dense, fine to medium grained sand, occasionally with extremely weathered fine and medium-grained sandstone. This material is expected to be readily excavatable using conventional mining equipment. Geotechnical logging indicated that between 85% and 90% of the material falls into the dense sand category.

Figure 8: An example of dense sand which constitutes 85-90% of the Thunderbird deposit (the sample has been cut with a hand trowel) Approximately 10% of the sonic core was logged as hard material comprising either siliceous to weathered sandstone situated above the mineralisation in localised domains or as discontinuous zones within the mineralisation containing multiple thin (typically less than 2cm) iron cemented sand layers. The engineering assessment indicated that the majority of hard layers likely to be encountered, regardless of type, can be classified as ‘hard digging’ or ‘easy ripping’.

An assessment of trafficability indicated that the residual sands and silty sands are very dense and are expected to be readily trafficable in dry conditions. During the wet season ‘good’ to ‘excellent’ trafficability has been inferred with temporary interruption of mining likely only during extreme rainfall events.

Based on in-situ testing, inflows into excavations are likely to be relatively slow due to low permeability and dewatering should be readily managed by conventional sump pumping as required.

Open pit stability studies indicate that overall design slopes between 40˚ and 60˚ should be feasible. It was also concluded that this was a conservative assessment because cut slopes in the unsaturated residual soils with appreciable fines content should be capable of standing at steeper angles. In addition, due to successive backfilling of voids the active pit slopes are not exposed for long periods of time.

Remaining Pre-feasibility work Pre-feasibility work is nearing completion and is on schedule to be finalised during April 2015.

The remaining work in progress comprises:

Process engineering using results of metallurgical testwork on the 12.5 tonne sample;

 Stage 2 infrastructure study focusing on site infrastructure and power;

 Market appraisal and product quality assessment;

 Pit optimisation and mine scheduling studies;

 Investigation of project capex and opex, development and throughput options; and  Financial modelling.

 About Thunderbird The Thunderbird deposit is one of the largest and highest grade mineral sands discoveries in the last 30 years. The total mineral resource is 3.2Bt @ 6.8% HM (Measured, Indicated and Inferred) (at 3% HM cut-off), containing 95Mt of valuable heavy mineral, including 19.3Mt of zircon (see ASX release dated 12 December 2014 and Appendix 1).

Within this is a coherent high grade zone of 1.080Bt @ 11.8% HM (Measured, Indicated and Inferred) (at 7.5% HM cut-off), containing 10.0Mt of zircon, 3.1Mt of high-titanium leucoxene,

2.8Mt of leucoxene and 36Mt of ilmenite.

A Scoping Study, released on 14 April 2014 and based on the smaller 19 March 2014 resource, showed the project has potential to generate consistently strong cash margins from globally significant levels of production over an initial 32 year mine life.

Sheffield was recently granted preferred proponent status for the Derby Wharf Bulk Handling Facility, which represents a potential infrastructure solution for the project (see ASX release dated 2 March 2015).

The project has been designated a Level 2 Lead Agency Project Proposal by the WA Department of Minerals and Petroleum (“DMP”). The DMP will advise and assist the Company with coordination of approvals across other WA Government agencies during the presubmission and submission stages of the Project proposal (see ASX release dated 6 March 2015).

–  –  –

Website: www.sheffieldresources.com.au

COMPLIANCE STATEMENTS

PREVIOUSLY REPORTED INFORMATION

This report includes information that relates to Exploration Results, Mineral Resources and Scoping Study results which were prepared and first disclosed under the JORC Code 2012. The information was extracted from the

Company’s previous ASX announcements as follows:

 “THUNDERBIRD HIGH GRADE RESOURCE SURPASSES ONE BILLION TONNES” 12 December 2014

 “SHEFFIELD DOUBLES TOTAL MINERAL RESOURCES AT WORLD CLASS THUNDERBIRD HMS DEPOSIT” 19

March 2014  “SCOPING STUDY HIGHLIGHTS THUNDERBIRD’S EXCEPTIONAL FINANCIAL RETURNS” 14 April, 2014 These announcements are available on Sheffield Resources Ltd’s web site www.sheffieldresources.com.au.

The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and, in the case of reporting of Exploration Results, estimates of Mineral Resources or results of Scoping Studies, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which any Competent Person’s findings are presented have not been materially modified from the original market announcement.

SCOPING STUDY

The Scoping Study referred to in this report is based on low-level technical and economic assessments, and is insufficient to support estimation of Ore Reserves or to provide assurance of an economic development case at this stage, or to provide certainty that the conclusions of the Scoping Study will be realised.

The Company believes it has a reasonable basis for making the forward looking statements in this report, including with respect to any production targets, based on the information contained in the announcement “SCOPING STUDY HIGHLIGHTS THUNDERBIRD’S EXCEPTIONAL FINANCIAL RETURNS”, dated 14 April 2014, and with respect to the Mineral Resource for Thunderbird as at 19 March 2014, independently compiled by QG Pty Ltd, together with independent metallurgical, processing design, engineering, mining and marketing studies, product quality assessment, external commodity price and exchange rate forecasts and global operating cost data.

FORWARD LOOKING STATEMENTS

Some statements in this report regarding estimates or future events are forward-looking statements. They involve risk and uncertainties that could cause actual results to differ from estimated results. Forward-looking statements include, but are not limited to, statements concerning the Company’s exploration programme, outlook, target sizes and mineralised material estimates. They include statements preceded by words such as “anticipated”, “expected”, “likely” “should”, “scheduled”, “intends”, “potential”, “prospective” and similar expressions.



Pages:   || 2 |


Similar works:

«Enter and View Report Place visited: Ward B4, Ward B7, Amethyst Ward and Admission Unit, Diana Princess of Wales Hospital, Grimsby Registration Details: Diana, Princess of Wales Hospital (DPOW) provides medical, surgical, critical care, maternity, children’s and young people’s services for people across North East Lincolnshire. The hospital also provides accident and emergency (A&E) and outpatients’ services. Date: 3 June 2015 Visited by: April Baker, Jenny Smith, Enda Wicks and Paul...»

«Commissioning Policy: Ethical framework for priority setting and resource allocation April 2013 Reference : NHSCB/CP/01 NHS Commissioning Board Commissioning Policy: Ethical framework for priority setting and resource allocation First published: April 2013 Prepared by the Medical Directorate, NHS Commissioning Board, working with Public Health © Crown copyright 2013 First published April 2013 Published by the NHS Commissioning Board, in electronic format only. Commissioning Policy – Ethical...»

«The Age-Adjusted Value of a Statistical Life: Evidence from Vehicle Choice James O’Brien Georgetown University Draft Version: 06-30-2013 Preliminary Draft – Work in Progress Abstract: In this paper I estimate an age-adjusted value of statistical life (VSL) by examining consumer automobile purchases. Many public policies target the health and safety of older people, but most VSL estimates come from hedonic wage regressions with few older workers and no retirees. Although underrepresented in...»

«Aus dem Institut für Arbeitsmedizin der Medizinischen Fakultät Charité – Universitätsmedizin Berlin DISSERTATION Arthrose: Eine Analyse nach qualitativen und quantitativen szientometrischen Blickpunkten zur Erlangung des akademischen Grades Doctor medicinae (Dr. med.) vorgelegt der Medizinischen Fakultät Charité – Universitätsmedizin Berlin von Sebastian Mayer aus Heilbronn Gutachter: 1. Prof. Dr. med. D. Groneberg 2. Priv.-Doz. Dr. med. F. C. Dimeo 3. Priv.-Doz. Dr. med. V. Harth...»

«Developments in Community Child Health: what’s new? Annual Scientific Meeting of the British Association for Community Child Health 16 & 17 September 2014 Royal Welsh College of Music & Drama Cardiff Venue BACCH ASM 2014 Room Room 2.06 2.05 Studio 2 Locations Registration, refreshments and exhibitors (stands 1-10) Foyer (Ground Level, no 1) Further refreshments, Poster boards and Linbury Gallery (Ground Level, no 4) exhibitors (stands 11-12) Main Lecture Hall Dora Stoutzer Hall (Ground Level,...»

«Enron Creditors Recovery Corp. Ponderosa Assets, L.P. (Claimants) v. The Argentine Republic (Respondent) (ICSID Case No. ARB/01/3) (Annulment Proceeding) _ Decision on the Application for Annulment of the Argentine Republic _ Members of the ad hoc Committee Dr. Gavan Griffith Q.C., President Judge Patrick L. Robinson Judge Per Tresselt Secretary of the ad hoc Committee: Mr Gonzalo Flores Counsel assisting the ad hoc Committee: Dr Christopher Staker Representing the Claimants: Representing the...»

«The Life Course “Connection”: An Exploration of Women’s Dietary Choices in a Northern First Nations Community1 Krista L. Johnson Malek Batal François Haman Pascal Imbeault Jules M. Blais Shinjini Pal Timothy A. Seabert Eva Krümmel Michael A. Robidoux Abstract The high incidence of obesity and obesity related diseases have been welldocumented within First Nations communities across Canada. Therefore, examining current dietary choices and then altering and managing alternative healthier...»

«IMPLEMENTATION OF ELECTRONIC HEALTH RECORDS: MODELING AND EVALUATING HEALTHCARE INFORMATION SYSTEMS FOR QUALITY IMPROVEMENTS IN THE U.S.HEALTHCARE INDUSTRY by Vinata A. Kulkarni A Dissertation Presented in Partial Fulfillment Of the Requirements for the Degree Doctor of Philosophy Capella University October 2006 © Vinata Kulkarni, 2006 Abstract In spite of several innovative measures in the United States (U.S.) healthcare industry, the industry is not only lagging behind other industries in...»

«BASIC SURGICAL TECHNIQUES Textbook Authors: György Wéber MD, PhD, med. habil. János Lantos MSc, PhD Balázs Borsiczky MD, PhD Andrea Ferencz MD, PhD Gábor Jancsó MD, PhD Sándor Ferencz MD Szabolcs Horváth MD Hossein Haddadzadeh Bahri MD Ildikó Takács MD Borbála Balatonyi MD University of Pécs, Medical School Department of Surgical Research and Techniques 20 Kodály Zoltán Steet, H-7624 Pécs, Telephone: +36 72 535 820 Website:http://soki.aok.pte.hu PREFACE The healing is impossible...»

«Salmon Closed-Containment Workshop Wild Salmon Nature Centre Chamcook, New Brunswick, Canada April 29-30, 2014 WORKSHOP PRORGAM Salmon Closed-Containment Workshop Program Day 1: Tuesday, April 29 7:30 – 8:15 CONTINENTAL BREAKFAST (Wild Salmon Nature Centre) Pick up registration package 8:15 – 8:30 Welcome & Introductory Remarks Bill Taylor, Atlantic Salmon Federation Steve Summerfelt, The Conservation Fund’s Freshwater Institute (TCFFI) Fish Health and Welfare Research (8:30-12:00)...»

«SMART AUTO BODY AUTO REPAIR AND DISMANTLING A guide to permitting requirements, environmental regulations, and best management practices for the automotive industry in New York City Bill de Blasio, Mayor Emily Lloyd, Commissioner The Mission of the New York City Department of Environmental Protection is to protect public health and the environment by supplying clean drinking water, collecting and treating wastewater, and reducing air, noise, and hazardous materials pollution. TABLE OF CONTENTS...»

«Aus dem Zentrum für klinische Tiermedizin der Tierärztlichen Fakultät der Ludwig-Maximilians-Universität München aus der Medizinischen Kleintierklinik Vorstand: Univ.-Prof. Dr. Katrin Hartmann Felines Asthma und chronische Bronchitis: Untersuchungen zu Anamnese, Allergiediagnostik und Therapie mit Propentofyllin Inaugural-Dissertation zur Erlangung der tiermedizinischen Doktorwürde der Tierärztlichen Fakultät der Ludwig-Maximilians-Universität München von Ulrike Stursberg, geb....»





 
<<  HOME   |    CONTACTS
2016 www.abstract.xlibx.info - Free e-library - Abstract, dissertation, book

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.