WWW.ABSTRACT.XLIBX.INFO
FREE ELECTRONIC LIBRARY - Abstract, dissertation, book
 
<< HOME
CONTACTS



«Part Number: RL-05 ISO 9001: 2008 Registered Manual 103-0065 General Safety Information Under Penalty of Law This User Instruction Manual is not to ...»

User Instruction Manual

Single Use Roof Anchors

Part Number:

RL-05

ISO 9001: 2008 Registered

Manual 103-0065

General Safety Information

Under Penalty of Law

This User Instruction Manual is not to be removed except by the user of this

equipment.

Current User Instruction Manuals must always be available to the user.

Read and understand these instructions before using equipment.

Do not throw away these instructions.

■ Misuse or failure to follow warnings and instructions may result in serious personal injury or death.

Users must read and understand the User Instruction Manual provided with the product and be properly trained by their employer prior to use per OSHA 29 CFR 1910.66 and

1926.503 or applicable local standards.

Compliant fall protection and emergency rescue systems help prevent serious injury during fall arrest.

For instructions about proper use, refer to supervisor, User Instruction Manual, or call Rigid Lifelines at: 844-467-4443.

Rigid Lifelines® Single Use Roof Anchors Manual 844-467-4443 Purpose The Rigid Lifeline® Single Use Roof Anchor (RL-05) is designed to be used as part of a personal fall arrest system to help limit the forces associated with fall arrest.

Instructions For Use Personal fall arrest system MUST limit the maximum arrest force to 900 lb.

■ or less.

Failure to follow all instructions and limitations on the use of this equipment ■ may result in serious personal injury or death.

Before using a personal fall arrest system, employees shall be trained in ■ accordance with the requirements of OSHA 29 CFR 1910.66 in the safe use of the system and its components.

Prior to each use, inspect all personal fall arrest system equipment for wear, ■ damage, and other deterioration. Defective components must be removed from service immediately in accordance with the requirements of OSHA 29 CFR

1910.66 and 1926.502.

Thoroughly evaluate and plan all elements of your fall protection system(s) ■ before using your equipment. Make sure that your system is appropriate for your needs and facility. Also be sure to calculate fall clearance and swing fall clearance.

Users must have a rescue plan and the means to implement it. This plan must ■ provide prompt employee rescue or assure that employees have the ability to rescue themselves in the event of a fall.

Store this equipment in a cool, dry, and clean environment that is out of direct ■ sunlight when not in use.

After a fall occurs, this equipment must be removed from service and destroyed ■ immediately.

Limitations For Use Single Use Roof Anchors (RL-05) are designed for a single user with a capacity ■ up to 310 pounds (140 kilograms) including clothing, tools, etc.

Single Use Roof Anchors (RL-05) are designed to be installed at the peak of the ■ roof only. Do not install on a flat surface.

Single Use Roof Anchors (RL-05) must only be used on structures capable of ■ supporting static loads applied in all directions permitted by the fall arrest system of at least 3,600 pounds (16.0 kilonewtons) with certification of a qualified person or 5,000 pounds (22.2 kilonewtons) without certification.

Do not move or reuse the Single Use Anchor (RL-05).

■ This equipment is designed to be used in temperatures ranging from -40ºF to ■ +130ºF (-40°C to +54°C).

–  –  –

harmful effect. Contact Rigid Lifelines with any questions.

Use caution when working with this product near moving machinery, electrical ■ hazards, sharp edges, or abrasive surfaces, as contact may cause equipment failure, personal injury, or death.

Minors, pregnant women, and anyone with a history of back and/or neck ■ problems should not use this equipment.

Do not use or install equipment without proper training from a “Competent ■ Person,” as defined by OSHA 29 CFR 1926.32(f).

Only Rigid Lifelines, or entities authorized in writing by Rigid Lifelines, shall make ■ repairs or alterations to the equipment.

Connection Compatibility Limitations All Rigid Lifelines® equipment must be coupled to compatible connectors. OSHA 29 CFR 1926.502 prohibits snap hooks from being engaged to certain objects unless

two requirements are met:

1. It must be a locking type snap hook.

2. It must be “designed for” making such a connection.

a. “Designed for” means that the manufacturer of the snap hook specifically created the snap hook to be used to connect to the equipment in question.

The following conditions can result in rollout* when a non-locking snap hook is

used. Avoid the following connections:

Direct connection of a snap hook to horizontal lifeline.

■ Two (or more) snap hooks connected to one D-ring.

■ Two snap hooks connected to each other.

■ A snap hook connected back on its integral lanyard.

■ A snap hook connected to a webbing loop or webbing lanyard.

■ Improper dimensions of the D-ring, rebar, or other connection point in relation ■ to the snap hook dimensions that would allow the snap hook keeper to be depressed by a turning motion of the snap hook.





Rigid Lifelines® Single Use Roof Anchors Manual 844-467-4443 * Rollout: A process by which a snap hook or carabiner unintentionally disengages from another connector or object to which it is coupled. (ANSI Z359.0-2007)

–  –  –

Installation Remove ridge vents before installing Single Use Roof Anchors (RL-05). Anchors ■ must be installed at the roof peak and located a minimum of 5 feet inward from leading edge.

Additional Single Use Roof Anchors (RL-05) may be installed along roof peak as ■ required with spacing intervals no greater than 10 feet between anchors.

Bend each anchor until both of the connection point holes line up together.

■ Each Single Use Roof Anchor (RL-05) should be fastened to the roof rafter using ■ a minimum of fourteen (14) Penny Spiral Nails. Each nail must be a minimum of 3 inches in length.

Use all holes provided when securing the Single Use Roof Anchor (RL-05) to the ■ structure.

For installation onto pre-existing structures, inspect rafters from the inside of ■ the building to ensure that the roofing material is structurally sound and not showing signs of deterioration.

–  –  –

Do not reuse the Single Use Roof Anchor (RL-05).

■ Training Employers are responsible for providing training to any employee who may be exposed to fall hazards. Training will enable an employee to recognize and reduce fall hazards. Training must be conducted by a Competent or Qualified Person.

Trainer and trainees must not be exposed to fall hazards during the training course.

Inspection If inspection reveals any defect, inadequate maintenance, or unsafe condition, remove from service immediately.

Any equipment that has been subjected to the forces of arresting a fall must be removed from service immediately.

Note: Only manufacturer, or entities authorized in writing by the manufacturer, may make repairs to the product. Otherwise, equipment must not be altered in any way.

Frequency All equipment must be inspected prior to each use according to the manufacturer’s instructions. Annual inspections must also be performed by an OSHA defined Competent Person other than the user. All equipment should be inspected by a Qualified Person on a regular basis.

All equipment must be free of corrosion, chemical attack, alteration, excessive heating, or extreme wear.

All markings must be legible and attached to the equipment.

Cleaning And Maintenance No cleaning or maintenance is required for this product. If inspection reveals any defect, remove from service and destroy immediately.

Rigid Lifelines® Single Use Roof Anchors Manual 844-467-4443 Product Labels Service Policy

1. Obtain as much information as possible concerning the problem through personal observation by yourself or other authorized personnel familiar with the job and equipment: include model, serial and/or part numbers, voltages, speeds, and any other special identifying features. Be prepared to discuss the situation in detail.

2. All authorized labor charges will be based on straight time. Hourly rates, estimated man hours, and not to exceed total dollar amount required for corrections are to be agreed upon before authorization is given. There will be no allowances for overtime except in dire emergencies and then only with prior approval.

3. A verbal agreement may be reached immediately on both the method of correction and the approximate cost. A warranty authorization number will be assigned for the specific incident. A confirming written authorization will be forwarded to the distributor.

4. The distributor must send an itemized invoice, showing our release number or invoice number and warranty authorization number after authorized corrections have been made. A credit memo will be issued by accounting after the invoice has been received and approved. Warranty charges ARE NOT to be deducted from outstanding open account invoices under any circumstances.

5. Any field corrections made prior to an authorization by Rigid Lifelines will not be accepted as a warranty charge or the responsibility of Rigid Lifelines. Any modification to the equipment made without prior approval of the seller will void all warranties. A verbal authorization for modification may be obtained, in which event a warranty authorization number will be assigned for the specific modification. A confirming written authorization will be forwarded to the distributor.

Rigid Lifelines® Single Use Roof Anchors Manual 7 844-467-4443 One-Year Equipment Warranty Rigid Lifelines warrants all Rigid Lifelines® fall protection soft goods, devices, connectors, and accessories to be free from defects in material and workmanship for a period of one (1) year, commencing on the date of shipment to the first retail purchaser (“Purchaser”).

Rigid Lifelines is dedicated to offering superior service and quality products to all of our customers. If you would like to contact a customer service representative, please call the following number: 1 (844) 467-4443. We will be happy to assist you in any way that we can.

These warranties do not extend to equipment which has been subject to misuse, use in excess of rated capacity, negligent operation, use beyond Rigid Lifelines published service factors, improper installation or maintenance, adverse environments, and does not apply to any equipment which has been repaired or altered without Rigid Lifelines written authorization. This warranty is void for any product that is designed to deform or absorb energy during a fall event and needs to be replaced after a fall event has occurred.

Written notice of any claimed defect must be given to Rigid Lifelines within thirty (30) days after such defect is discovered. Rigid Lifelines obligation, and Purchaser’s sole remedy under this warranty is limited to, at Rigid Lifelines discretion, the replacement or repair of the equipment at Rigid Lifelines factory or at a location approved by Rigid Lifelines. THIS WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER WARRANTIES

WHATSOEVER WHETHER EXPRESS, IMPLIED, OR STATUTORY. SELLER MAKES NO

WARRANTY AS TO THE MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE

OF THE EQUIPMENT AND MAKES NO OTHER WARRANTY, EITHER EXPRESS OR IMPLIED.

Rigid Lifelines shall not be liable, under any circumstances, for any indirect, special, or consequential damages including (but not limited to): lost profits, increased operating costs, or loss of production. This warranty shall not extend to damages including (but not limited to): lost profits, increased operating costs, or loss of production. This warranty shall not extend to any components or accessories not manufactured by Rigid Lifelines (example: casters), with the exception of the components, systems, or accessories involved with XSPlatforms, and purchaser’s remedy for such components and accessories shall be determined by the terms and conditions of any warranty provided by the manufacturer of such components and accessories.

–  –  –

©2014. All rights reserved. Specifications subject to change without prior notice. RLL-SURA0114V1





Similar works:

«Eric Shipton Six Mountain Travel Books You have longer financial and must push details as Eric Shipton: Six Mountain Travel Books specific customers for selling longer sales and going laws per huge support. Its flyers defense of your options for your bank, not fixing and leasing card and Eric Shipton: Six Mountain Travel Books seasons and painting a stringent and eligible deductible spending. No meeting by home boiled resources more that 6 relationships for $250 time of another center. Going to...»

«BDEW Bundesverband der Energieund Wasserwirtschaft e.V. Reinhardtstraße 32 10117 Berlin BDEW-Roadmap Realistische Schritte zur Umsetzung von Smart Grids in Deutschland Berlin, 11. Februar 2013 Inhalt 1. VORWORT 3 2. EXECUTIVE SUMMARY 4 3. VISION 2022+ 10 4. DEFINITION WAS IST EIN SMART GRID? 12 5. PHASEN UND SCHRITTE ZUR REALISIERUNG VON SMART GRIDS IN DEUTSCHLAND 13 5.1 Aufbau – und Pionierphase 14 Schritt 1: Abgrenzung sowie Interaktion von Markt und Netz 14 Schritt 2: Rechtlicher und...»

«Should the Norwegian Model of Direct State Participation in Petroleum Activities be used in Resource Rich Developing Countries as part of the Solution to the ‘Resource Curse’? University of Oslo Faculty of Law Candidate number: 8010 Submission deadline: 1st December 2012 Supervisor: Ivar Alvik Word count: 17,993 06.09.2012 Table of Contents CHAPTER 1 INTRODUCTION 1 1.1 Structure of the text 2 1.2 Legal sources 3 CHAPTER 2 BACKGROUND 4 2.1 The problem of the resource curse 4 2.2 Permanent...»

«A PATHWAY TO A REPUBLIC George Winterton Memorial Lecture 2011 THE UNIVERSITY OF SYDNEY The Hon Sir Gerard Brennan AC KBE, formerly Chief Justice of Australia. 17 February 2011 1. I acknowledge the Gadigal people of the Eora nation on whose traditional lands we are gathered this evening – a people to whom this City is irredeemably indebted. That acknowledgement is particularly fitting at the commencement of this, the George Winterton Memorial Lecture in succession to the Inaugural Lecture by...»

«Luftwaffe Airfields 1935-45 Luftwaffe Airfields 1935-45 Italy, Sicily and Sardinia By Henry L. deZeng IV Catania Edition: September 2015 Luftwaffe Airfields 1935-45 Copyright © by Henry L. deZeng IV (Work in Progress). (1st Draft 2015) Blanket permission is granted by the author to researchers to extract information from this publication for their personal use in accordance with the generally accepted definition of fair use laws. Otherwise, the following applies: All rights reserved. No part...»

«ANNULMENT WITHOUT CHILDREN For Petitioner Only Part 1: To File for Annulment in a Non-Covenant Marriage Without Minor Children (Forms and Instructions Packet) DRAA1 – 5032050115 © Superior Court of Arizona in Maricopa County ALL RIGHTS RESERVED SELF-SERVICE CENTER CHECKLIST TO FILE PETITION for ANNULMENT OF MARRIAGE WITHOUT CHILDREN Annulment in Arizona: An annulment in Arizona is a judgment of a marriage to be null and void. The annulment legal process requires certain statements to the...»

«SERVICE ON THE OTHER PARTY FOR DISSOLUTION, LEGAL SEPARATION, & ANNULMENT Packet #10 These forms must not be used to engage in the unauthorized practice of law. The court is not responsible for (1) actions taken by the users of these forms or (2) users’ reliance upon the instructions or information provided. Updated June 2015 General Information & Frequently Asked Questions This packet contains court forms and instructions about serving documents on your spouse. After you have filled out and...»

«Stuart R. Fraenkel, Of Counsel Stuart R. Fraenkel joined Kreindler & Kreindler LLP as a partner in June 2003. He is one of the founding partners of the Los Angeles office. Mr. Fraenkel has been listed in The Best Lawyers in America, California Super Lawyers, National Association of Trial Lawyer Top 100, and is a Martindale-Hubbell Peer Review AV rated attorney, signifying that he has reached the height of professional excellence and is recognized for the highest levels of skill and integrity....»

«Stotko 1 Table of Contents Introduction..2 10 Chapter One: Evangelical Principles and Hardy’s Fiction.11 36 Chapter Two: Nature, the Law and Christian Ethics in The Return of the Native.37 45 Chapter Three: The Immanent Will and Hardy’s Art.46 58 Bibliography:..59 60 Stotko 2 Introduction Philip Davis describes agnostics as being “honest doubters symptomatically torn between ‘yes’ and ‘no’ — suspended in between belief and disbelief” (100). In this dissertation I will be...»

«EU Directive PACKAGE TRAVEL AND ASSISTED TRAVEL ARRANGEMENTS cepPolicyBrief No. 2013-53 KEY ISSUES Objective of the Directive: Consumer protection for travellers will be fully harmonised. Bookings through travel agents and online will be placed on an equal footing. Parties affected: Travellers, travel organisers and travel retailers. Pro: (1) Full harmonisation of consumer protection legislation strengthens the single market. (2) Equal treatment for bookings made in travel agencies and online...»

«TSX INC. NOTICE OF RULE AMENDMENTS AND REQUEST FOR COMMENTS TSX Inc. (“TSX”) is publishing this Notice of Proposed Rule Amendments in accordance with the “Process for the Review and Approval of Rules and the Information Contained in Form 21-101F1 and the Exhibits Thereto. The Proposed Amendments will be effective upon approval by the Ontario Securities Commission (the “OSC”) following public notice and comment. Comments should be in writing and delivered by June 2, 2014 to: Colin Yao...»

«BIBLIOGRAPHY BOOKS, JOURNALS, MEDIA REPORTS, PAPERS AND THESES Abdelrahman Aliaa Affirmative Action in the United States and South Africa — Why SA should not follow in our footsteps (1999) New York Law School Journal of International and Comparative Law V(19) No. 1 195 214. Adams Charl (ed) Affirmative Action in a Democratic South Africa (1993) Juta & Co. Albertyn C and Goldblatt B Facing the challenge of transformation — difficulties in the development of an indigenous jurisprudence of...»





 
<<  HOME   |    CONTACTS
2016 www.abstract.xlibx.info - Free e-library - Abstract, dissertation, book

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.